Lean Enterprise Institute Logo
  • Contact Us
  • Newsletter Signup
  • Cart (48)
  • Account
  • Search
Lean Enterprise Institute Logo
  • Explore Lean
        • What is Lean?
        • The Lean Transformation Framework
        • A Brief History of Lean
        • Lexicon Terms
        • Topics to explore
          • Operations
          • Lean Product & Process Development
          • Administration & Support
          • Problem-Solving
          • Coaching
          • Executive Leadership
          • Line Management
  • The Lean Post
        • Subscribe to see exclusive content
          • Subscribe
        • Featured posts
          Heijunka: Mastering the Peaks and Valleys

          Lean Product and Process Development at Scale:...

          craftsmanship

          Pursuing Perfection: Craftsmanship in Product Development

          • See all Posts
  • Events & Courses
        • Forms and Templates
        • Featured learning
          • The Future of People at Work Symposium 

            July 18, 2024 | Detroit, Michigan

          • Hoshin Kanri

            September 06, 2024 | Coach-Led Online Course

          • Lean Warehousing and Distribution Operations

            September 11, 2024 | Plant City, Florida and Gainesville, Florida

          • Key Concepts of Lean Management

            September 16, 2024 | Coach-Led Online Course

          • See all Events
  • Training & Consulting for Organizations​
        • Interested in exploring a partnership with us?
          • Schedule a Call
        • Getting Started
        • Leadership Development
        • Custom Training
        • Enterprise Transformation​
  • Store
        • Book Ordering Information
        • Shopping Cart
        • Featured books
          Managing to Learn: Using the A3 management process

          Managing to Learn: Using the A3 management process

          A3 Getting Started Guide 2

          A3 Getting Started Guide

          • See all Books
  • About Us
        • Our people
          • Senior Advisors and Staff
          • Faculty
          • Board of Directors
        • Contact Us
        • Lean Global Network
        • Press Releases
        • In the News
        • Careers
        • About us

The Lean Post / Articles / Heijunka: Mastering the Peaks and Valleys

Heijunka: Mastering the Peaks and Valleys

Operations

Heijunka: Mastering the Peaks and Valleys

By Jeff Smith

May 1, 2015

Struggling to run different types of products down one line? Lean coach Jeff Smith explains the lean manufacturing concept of Heijunka (or production leveling) by way of a story.

FacebookTweetLinkedInPrintComment

As a lean coach in manufacturing, I hear a lot of people express an inability to run different products down one line even though they would like to do so for cost savings purposes (i.e. people, equipment, machines, space, and so on). Most people have never heard of the lean principle of Heijunka, which is about using resources more effectively by sequencing production by sales ratio and then distributing the workload to people in order to achieve maximum cost-saving benefits as described above.

If you find yourself struggling with how to do it, here’s a scenario I hope you can use to get started. A hypothetical conversation between myself and fellow lean coach Danielle McGuinness:

Jeff: “Hey Danielle, let’s tackle the challenging subject of Heijunka for businesses with assembly operations.”

Danielle: “OK, what do you want to tackle about it?”

Jeff: “Let’s give an example of a multi-product line. We can show a sales breakdown of different types of models and their different build times. Want to show how to sequence those items so we can use the correct number of people and not create any bottlenecks (jobs over takt time)?

Danielle: “Right on. Let’s use stoves as a product. Three main types: 3 foot, 4 foot, and 5 foot (top of stove). Furthermore, we have a daily (from monthly) level demand of 45 units. And the customers order 50% 3 foot, 25% 4 foot, and 25% 5 foot.”

Jeff: “So the difference in the size refers to a larger stove with more goodies on it… like a griddle, more burners to cook on, possibly an additional oven, and so on? I take it these stoves take different times to build? And that we need to figure out if they can be made on the same line?”

Danielle: “Yes. So let’s say the 3 foot is 180 minutes of work, the 4 foot is 220 minutes, and the large 5 foot is 240 minutes total. Since this company works 450 minutes (7.5 hours/shift), the assembly line has a takt time of 10 minutes.”

Jeff: “Got it. So if we sum the weighted total cycle time for all models we can divide by takt time to find the allocated workload for a station/job, then go about figuring out a physical layout for how many people work on a unit per station and so on.”

Danielle: “Right. And we said the customer demand for a 3 foot stove is 50% and the total cycle time for this model is 180 minutes to build… The weighted cycle time for this 3 foot stove is then 90 minutes in our calculation… If we do the same for a 4 foot stove (220 minutes * 25%) we get 55 minutes total, and a 5 foot stove gives us (230 minutes * 25%) 57.5 minutes.”

Jeff: “So that means we can total those weighted sums of 90+55+57.5 minutes and divide by our takt time of 10 minutes. That means 202.5 minutes of weighted total cycle time / 10 minute takt time gives us 20.25 people to allocate work to for in a weighted average scenario, right? Probably means making it work with 20 people total?” 

Danielle: “Yes. We would accept that small challenge and allocate workload to 20 people. That could mean 2 people per station for a ten station line, or it could mean a 20 station line of 1 person per station. Also, it could be somewhere in-between.  Also, we can figure out how much work per person for each model, because we have the number of people already decided at 20.”

Jeff: “I think I’m following you… So a 180 minute 3 foot stove divided by 20 people is basically 20 jobs with a 9 minute workload per job. Same for a 4 foot stove (220 minutes/20 people) yielding 11 minutes a job, and a 5 foot stove would be (230 minutes/20 people) with 11.5 minutes job?”

Danielle: “Yes, and we can see how important Sequential Scheduling discipline would be to keep up with a ten minute takt time on a weighted average continuous flow assembly line making stoves one after another.”

Jeff: “I guess it means that if every other model is a 3 foot stove we gain a minute on the takt time to start working on the next product which is a 4 or five foot stove taking a minute to a minute and a half more to wash out the time over takt?”

Danielle: “To make it really wash out we could take that extra half minute on the longest model off line, or even eliminate some that amount of reach and walk waste out of the cycle time for a 5 foot to bring it down to a 4 foot time.” 

Jeff: “This seems like a good plan to use the correct number of resources right out of the gate to build different cycle time stoves on one line. We could of course just sequentially supply big parts to the side of the line behind the operator to support and re-enforce their standardized work, as well as putting kits of small parts and fasteners down the line with the stoves to eliminate much walking (keeping people focused upon building quality in station).”

Danielle: “This would be a good starting baseline of Standardized Work in a weighted average or multi-product line environment. The managers and line associates would learn to master the peaks and valleys of work difference with the support of a good production scheduling sequence.”

Jeff: “Ok, sounds good. Let’s talk about Heijunka more in the future.”

Danielle: “Next time we can add some other challenges to the situation to learn from.”

FacebookTweetLinkedInPrintComment

Written by:

Jeff Smith

About Jeff Smith

Jeff has 22 years of Toyota Production System experience gained through his work at NUMMI as a Supervisor of Truck Frame & Chassis Lines, Labor Relations Representative, and with the TPS internal Kaizen Group. Jeff also had a multiyear assignment with the Toyota Supplier Support Center. After resigning from Toyota,…

Read more about Jeff Smith

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Related

A digitized brain exploding into vectors and jumbled computer code.

Operations

A New Era of Jidoka: How ChatGPT Could Alter the Relationship between Machines, Humans, and their Minds

Article by Matthew Savas

improvement kata coaching kata model 2

Operations

The Fundamentals of Improvement and Coaching Kata

Article by Lean Leaper

sensei back belt close up

Operations

Ask Art: Why is a Lean Sensei Necessary?

Article by Art Byrne

Related books

The Power of Process book cover

The Power of Process – A Story of Innovative Lean Process Development

by Eric Ethington and Matt Zayko

The Gold Mine (Audio CD)

The Gold Mine (Audio CD)

by Freddy Ballé and Michael Ballé

Related events

September 11, 2024 | Plant City, Florida and Gainesville, Florida

Lean Warehousing and Distribution Operations

Learn more

September 26, 2024 | Morgantown, PA or Remond, WA

Building a Lean Operating and Management System 

Learn more

Explore topics

Operations graphic icon Operations

Subscribe to get the very best of lean thinking delivered right to your inbox

Subscribe
  • Privacy Policy
  • Sitemap
  • LinkedIn
  • Twitter
  • YouTube
  • Instagram
  • Facebook

©Copyright 2000-2024 Lean Enterprise Institute, Inc. All rights reserved.
Lean Enterprise Institute, the leaper image, and stick figure are registered trademarks of Lean Enterprise Institute, Inc.

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Learn More. ACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT